WILDEN APPLICATION GUIDE
WILDEN Pumps for Marine and Shipyard Utilities
Marine maintenance involves confined spaces, changing liquid levels and long hose runs. Identify whether the duty is bilge handling, wastewater, cleaning fluid or another service. Keep incompatible streams segregated and define how the liquid will be collected and disposed of.

Typical transfer duty
Qualified dewatering, wastewater and utility-liquid duties
Collection point → Utility transfer → Approved receiving system
What to evaluate
Review suitable Pro-Flo or Turbo-Flo utility configurations against the medium and required duty. Installation and materials should be selected for the actual exposure rather than assuming marine suitability from the pump material alone.

Selection checklist
Record lift and discharge route
Confirm exhaust routing and ventilation
Plan corrosion inspection and spare availability
Operating boundary
A general utility application guide does not establish class approval, potable-water approval or fire-service suitability. Those duties need their own documented equipment requirements.
Maintenance and spare parts
Keep the complete WILDEN model code, installed diaphragm material and air distribution system in the maintenance record. Confirm air-kit and wet-kit compatibility separately. Follow the model-specific engineering, operation and maintenance manual for isolation, inspection, fastener torque and reassembly; a generic parts list is not a repair procedure.
Discuss your application
Send the fluid composition, concentration, temperature, viscosity, solids information, target flow, backpressure, suction conditions and available air supply. These details allow a meaningful configuration review and a matching spare-parts recommendation.
Explore WILDEN pumps · Repair kits · Request selection support
Editorial application guidance by Willee. Reference: Wilden Military and Marine. This page describes an application, not a customer installation or a guaranteed operating result.
English